STIC - Center for Science, Technology and Investment Consultancy

http://stic.com.vn


Load test of bridges in highway 70, highway 70B and highway 279

Load test of bridges in highway 70, highway 70B and highway 279
Constituent B: The second Credit project of Transportation industry to improve national road network . 
Location: 14 bridges on highway 70, highway 70B and highway 279 which are located in Yen Bai, Lao Cai, Lang Son, Dien Bien and Phu Tho. 
Owner: Viet Nam Road Administration
Content: Assess quality and bearing ability of the brigdes at the moment.
Some pictures of constructing:
1
Installing pressure sensor on Pac Khuong bridge 
 
2
Acceleration sensor for measuring concussion of abutment of Pa Nam bridge.
 
3
Concrete ultrasound of Bac Ngam bridge.
 
4
Detecting concrete reinforcement diameter of Bac Ngam bridge
5
Measuring span structure oscillation of Pho Rang bridge.
 
6
Weighing axle of Ngoi Khang bridge.
 
7
 Stacking cars for load test of Ngoi Chi bridge
 
8
 Installing equipment on Pho Rang bridge 
 
9
Examining current state of Lu bridge.
11
Measuring altitude of Cap Na bridge surface
 
12
Collecting data of Pho Rang bridge
You did not use the site, Click here to remain logged. Timeout: 60 second