Inspection of Bach Dang Hotel Complex
- Wednesday - 20/03/2019 22:50
- Close page
Project: Bach Dang Hotel Complex; Location: Hai Chau District, Danang city; Owner: Bach Dang Hotel Services and Trading Joint Stock Company. Category: Hotel and office block - apartment block
The project is invested by Bach Dang Hotel Services and Trading Joint Stock Company with the total estimated capital of 700 billion VND.
Hotel tower block: 29 floors, including 226 rooms with an area of 35-60m2
Office tower block - apartment: 25 floors, including more than 3,000m2 and 70 luxury apartments.
II. INSPECTION CONTENT
1. INSPECTING ACTUAL STATE
- Survey crack
- Bore to test concrete
- Bore to determine crack depth
2. TESTING DEAD LOAD OF FLOOR
- Measure deflection, stress at floor and beams.
3. CACULATING REINFORCED STRUCTURE
- Base on design caculating result of FRP reinforcement.
(Related images)

Construction : Bach Dang hotel complex

Signal sensors

Load test by water
Load test after adhering FRP
The project is invested by Bach Dang Hotel Services and Trading Joint Stock Company with the total estimated capital of 700 billion VND.
Hotel tower block: 29 floors, including 226 rooms with an area of 35-60m2
Office tower block - apartment: 25 floors, including more than 3,000m2 and 70 luxury apartments.
II. INSPECTION CONTENT
1. INSPECTING ACTUAL STATE
- Survey crack
- Bore to test concrete
- Bore to determine crack depth
2. TESTING DEAD LOAD OF FLOOR
- Measure deflection, stress at floor and beams.
3. CACULATING REINFORCED STRUCTURE
- Base on design caculating result of FRP reinforcement.
(Related images)

Construction : Bach Dang hotel complex

Signal sensors

Load test by water
Load test after adhering FRP