Pre-loading project before using Thach Bich Bridge, Quang Ngai, Quang Ngai province

Tuesday - 27/11/2018 22:33 1.239 0
STIC performs load test before using Thach Bich Bridge, Quang Ngai City, Quang Ngai province.
thachbich


Thach Bich Bridge shall be constructed according to the scale of traffic works of level III and technical infrastructure works of level II. The intersection of Chu Van An and Ton Duc Thang streets (in Tran Phu ward) and the end of intersection with National Road 24B at Km22 + 300 in Tinh An Tay commune

Thach Bich bridge is designed with a total length of more than 2.4km, in which the bridge is longer than 875m, the bridge length is over 1.5km, the bridge width is 18m, the road cross section is 27m, built by the concrete structure reinforced concrete and prestressed reinforced concrete. At the intersection of Chu Van An and Ton Duc Thang streets, Tran Phu ward. (Quang Ngai city) end point at km 22 + 300 National Road 24B Tinh An Tay.
 
The Thach Bich Bridge Project was approved by the Chairman of the People's Committee in March, with a total investment capital of over VND643 billion
thachbich1

Total notes of this article: 0 in 0 rating

Click on stars to rate this article

  Reader Comments

You did not use the site, Click here to remain logged. Timeout: 60 second